Doctoral Research · Space Robotics Inspection with a Free-Flying Space Manipulator
A Doctoral Research Journal Aerospace Engineering

CHAIN_13 lever R — full-helix verdict (reach corridor on the 6-DOF)

Bars registered before the runs (chain file launch record, commit 8fedec7): derate fraction improves, pe_p99 < 0.2, coverage >= 0.99, completed. Metric definitions = run_mission.analyze (gates evaluated on the operational window, t > 90 s startup to completion).

run derate frac pe_med pe_p99 coverage completed t_complete [s] ze_p99 (info) nu_jump ctx (info)
r0 incumbent (rs 0.55) 0.644 0.0712 0.1651 0.9981 True 1070.8 0.0549 0.9210
rs 0.45 0.766 0.0922 0.1644 0.9981 True 809.2 0.0463 0.8864
rs 0.40 0.637 0.1018 0.1586 0.9978 True 762.6 0.0495 0.8938

Adoption is the USER’s call (re-pin consequences per pre_risk.md §3b); this verdict only applies the registered bars.

Interpretation (curated — the regen line covers the tables above only)

All gates pass at all three speeds; pe_p99 is nearly speed-invariant (0.158 flat, vs the incumbent’s 0.1651/0.1703/0.1660) and completion stays 753–776 s. Not fragile by the protocol rule. The adoption case is complete — dominance at nominal plus robustness under ±2%. Adoption itself is the user’s call (one deliberate re-pin of all 5 baselines per pre_risk.md §3b, the Jun-10 ceremony).

regen: /Users/antoniahoffman/miniforge3/envs/new-pin-env/bin/python validation/chain13_r_verdict.py